Standard
Number
|
Description
|
Notes
|
BAMR
Products
|
Date
|
| NACE
RP propo 97 |
Dehumidification
and temperature control during surface preparation, application
and curing of coatings/linings for tanks, vessels and other enclosed
spaces |
DRAFT
- Relationship between air temperature, humidity and temperature. |
|
1997
|
| NACE
RP0188-88 |
Discontinuity
(Holiday) Testing of Protective Coatings |
Low
and high voltage equipment and tests. |
|
1990
|
| NACE
RP0274 |
High
Voltage Electrical Inspection of Pipeline Coatings Prior to Installation |
DC
or Pulsed kit. Volts = 1250 x SQR(mils). |
|
1974
|
| NACE
RP0490-90 |
Holiday
Detection of Fusion-Bonded Epoxy External Pipeline Coatings of 10
to 30 Mils (0.25 to 0.76 mm) |
Use
DC system in dry conditions or Pulsed type in damp conditions. Calculate
V = 525 x SQR(T mils). Trailing ground lead of 9m is allowed provided
pipe is connected to 2-3ft earth spike and soil is not dry. Otherwise,
connect both earths. |
|
1990
|